
| Sr.No. | Name of Equipment | Investment(Rs) | Lab Area (Square meter) |
|---|---|---|---|
| 1 | Mechanics of Structure | 11,19,915 | 66 |
| 2 | Hydraulics | 4,50,450 | 66 |
| 3 | Surveying | 7,34,486 | 70 |
| 4 | Environmental Lab | 3,30,437 | 66 |
| 5 | Geotechnical Lab | 1,44,360 | 66 |
| 6 | Concrete Technology | 3,40,140.93 | 66 |
| 7 | Engineering Mechanics Lab | 47,971 | 66 |
Loading Please Wait...